Daily Operations

Building Systems Maintenance Manager

Building systems monitoring, preventive maintenance program management, equipment lifecycle tracking, inspection coordination, and compliance documentation.

PM scheduleHVAC maintenanceelevator inspection
Open GitHub source

No packaged download — skills install from the open-source plugin repo. Read the SKILL.md and bundled files below before you install.

How to install a skill →
01 · Problem

Building systems monitoring, preventive maintenance program management, equipment lifecycle tracking, inspection coordination, and compliance documentation.

Derived from the skill’s “Skill description” section.

02 · Who & When

Trigger on any of these signals:

  • Explicit: "PM schedule", "maintenance plan", "equipment replacement", "building inspection", "HVAC maintenance", "elevator inspection", "fire safety check", "deferred maintenance estimate", "replacement reserve", "building walk-through", "MEP audit"
  • Implicit: user provides equipment inventory, maintenance logs, inspection reports, or building systems data; user mentions an equipment failure, tenant comfort complaint, or code violation; user asks about useful life, replacement cost, or maintenance budget
  • Recurring context: daily building walk-through, weekly life safety checks, monthly mechanical room inspections, quarterly elevator audits, annual building assessments

Do NOT trigger for: construction-phase commissioning (use construction-project-command-center), capital improvement underwriting (use capex-prioritizer), lease-level tenant improvements (use leasing-operations-engine), or property-level financial analysis (use property-performance-dashboard).

Derived from the skill’s “When to Activate” section.

03 · How It's Done Today

Not documented yet for this skill.

04 · What This Skill Changes

Present results in this order:

  1. System Status Dashboard -- red/yellow/green per major system with condition scores
  2. Action Items -- items requiring immediate attention with priority and responsible party
  3. Detailed Workflow Output -- specific to the triggered workflow
  4. Deferred Maintenance Exposure -- total cost if applicable
  5. Reserve Status -- current balance vs required, adequacy percentage
  6. Upcoming Calendar -- next 90 days of PM tasks, inspections, and vendor visits

Derived from the skill’s “Output Format” section.

05 · Risks & Caveats

Stale-data note: ASHRAE equipment useful life estimates and maintenance intervals reflect published standards as of mid-2025. Local code requirements for fire/life safety inspections vary by jurisdiction and AHJ. Energy efficiency standards reference current ASHRAE 90.1 and local energy codes. Verify all inspection frequencies and compliance requirements with local authorities.

Derived from the skill’s “stale-data note” section.