Construction Project Command Center

Central command for ground-up development and major renovation projects.

RFIsubmittalconstruction drawpunch list

Download the CRE Skills Plugin

Latest release, portable bundle (signed). Review the SKILL.md files before installing into your agent.

dataNo personal data
What it does

Takes a project profile plus per-cycle inputs (schedule of values, RFI logs, change order proposals, safety reports) and returns verified draw packages, CO recommendations with contingency-burn context, earned value metrics, and lender-ready monthly reports.

Why it matters

Development managers juggle RFI logs in spreadsheets, change order emails in inboxes, and lender draw packages assembled the night before submission. Each workflow lives in a different place, so contingency burn is invisible until it is already a problem and lien waiver gaps surface at funding rather than at the desk.

How it's done today

A PM cobbles together a monthly draw package by pulling GC pay apps from email, checking retainage math by hand, chasing lien waivers via phone, and pasting earned value numbers into a Word report. Change orders get reviewed without a cumulative budget impact table in front of the reviewer. The lender report is assembled at 11 p.m. the day before the draw deadline.

When to use it

Reach for it

Use at any recurring construction cycle trigger: monthly draw prep, weekly OAC meeting, change order receipt, RFI submission, schedule update, or safety incident. Also use when a project crosses a distress threshold (CPI below 0.90, contingency burn ahead of completion percentage).

Not the right tool

Not for pre-development feasibility (use entitlement-feasibility), stabilized property operations (use building-systems-maintenance-manager), or post-construction lease-up (use lease-up-war-room). For original development budget modeling, use dev-proforma-engine.

What it needs and produces

Inputs

  • OM
  • Budget
Example use case

Month 8 of an 18-month, $32.5M ground-up multifamily. The GC submits a $348K change order for below-grade waterproofing. The skill checks the unit costs against RS Means benchmarks, confirms the 15% sub markup and 10% GC markup are within contract limits, classifies the CO as a potential design omission, calculates that approval pushes contingency consumption to 56% at 38% project completion (yellow threshold), and recommends approval with a written A/E explanation request.

Compatible agents

Agent personas that pair well with this skill

Works with
Limitations

OSHA references are 29 CFR 1926 as of mid-2025 and AIA form numbers reflect current editions. Retainage rates, lien waiver requirements, and prevailing wage rules vary by jurisdiction. The skill identifies gaps and flags thresholds but does not replace a licensed lender inspector, legal sign-off on lien releases, or the owner's certification on AIA G702.