Cross-Cutting Tools

IC Red Team Challenger

Pressure-tests a deal recommendation before it reaches the investment committee.

Open GitHub source

No packaged download — skills install from the open-source plugin repo. Read the SKILL.md and bundled files below before you install.

How to install a skill →
01 · Problem

Pressure-tests a deal recommendation before it reaches the investment committee.

Derived from the skill’s “Skill description” section.

02 · Who & When
  • User has a completed underwriting and/or stress test and asks to "red team," "pressure-test," "stress the thesis," "play devil's advocate," or "challenge this deal"
  • User asks "what will the IC ask," "what could kill this," "what are we missing," or "where are we anchored"
  • User is preparing for an investment committee, capital partner screen, or credit committee and wants an adversarial pre-read before the memo is finalized
  • Automatically invoked as the adversarial gate after acquisition-underwriting-engine and sensitivity-stress-test, before ic-memo-generator formalizes the recommendation
  • Do NOT trigger to build the base case or run the math (use acquisition-underwriting-engine); to generate sensitivity grids and the "what breaks first" cascade (use sensitivity-stress-test); to write the polished committee memo (use ic-memo-generator); or to assemble the IC packet and context bundle (use icomm-context-builder). This skill consumes those outputs and attacks them; it does not replace them.

Derived from the skill’s “When to Activate” section.

03 · How It's Done Today

Not documented yet for this skill.

04 · What This Skill Changes
# Red Team Review: [Deal Name]
Recommendation under review: [verdict + one-line thesis]
Red team verdict: DEFENSIBLE / DEFENSIBLE WITH CONDITIONS / NOT YET DEFENSIBLE

## 1. The Bull Case, Steelmanned
[3-4 sentences. The load-bearing assumption: ___. Most likely anchor: ___.]

## 2. Known Risks (Quantified)
| Known Risk | Prob | IRR Impact | Equity Impact ($) | Early-Warning Signal | Mitigant | Residual |
|---|---|---|---|---|---|---|
[6-8 rows, ranked by impact]

## 3. Known Unknowns (Diligence Gaps)
| Open Item | Why It Matters to the Verdict | Cost/Time to Resolve | If Unresolved by Decision Date |
|---|---|---|---|
[ranked]

## 4. Unknown Unknowns (Regime / Tail Risk)
- [Regime break 1]: silent assumption, directional damage, survives? Y/N
- [3-5 entries]

## 5. Disconfirming-Evidence Prompts
| Assumption | Disconfirming Question | Source | If the Answer Is Bad |
|---|---|---|---|
[one row per load-bearing assumption]

## 6. What Would Break the Deal
| Variable | Base Case | Break Trigger | What Breaks | Headroom |
|---|---|---|---|---|
[covenant, refi, exit cap, pace, occupancy at minimum]

## 7. IC Challenge Questions and Prepared Answers
> Q: ___
> Prepared answer (source: ___): ___
> If we cannot answer well: ___
[8-12, ordered by likelihood of being asked]

## 8. Verdict and Conditions
[DEFENSIBLE / WITH CONDITIONS / NOT YET DEFENSIBLE, tied to specific findings above]

Derived from the skill’s “Output Format” section.

05 · Risks & Caveats

Not documented yet for this skill.